Observations moving from Omonia to Paleologos
The net width of the left sidewalk (0.8 m) is not uniform. Total width: 1.2 m.
The material on the final surface of the left sidewalk is paved.
The net width of the right sidewalk (0.8 m) is not uniform. Total width: 1.2 m.
The material on the final surface of the right sidewalk is slabs.
Caution: There are a few points on the sidewalks where pedestrian traffic is with obstacles and/or imbalances (stairs, etc.).
Caution: Some "tubs" at their end towards the road surface form a strong step, more than 2 cm.
There are not all along the road the necessary "blind drivers" to allow a person to cross the road from start to finish.
Note: Tubs not marked with suitable plates of type "DANGER" (nowhere) were found.
Caution: There are some trees with branches less than 2.20m above the ground.
There are no traffic lights at the crossings.
Caution: Some signs, traffic lights and/or other items on a pole were found at a height below 2.20m above the ground.
Signs, traffic lights and other elements on a pole shall be placed as concentrated as possible (e.g. on a common pole).
Where baskets or garbage bins are placed there is always a net width of 90cm (on the pavement) left for pedestrian crossing.
Caution: In some cases, existing public phones, mailboxes, etc. are not accessible to persons with a wheelchair or are not at a height that can be served by a person in a wheelchair).
There are no benches on the street.
Caution: In some places, lighting at night is not sufficient, e.g. to identify obstacles for visually impaired people.
There are no disabled vehicle parking spaces on the road.
There are no public transport stops on the road.
Other comments: There are obstacles everywhere. Inaccessible road